標題: Cheap Jerseys 2018
無頭像
IblcaAv8

帖子 1485
註冊 2018-7-5
用戶註冊天數 2094
發表於 2018-8-11 18:45 
36.57.179.162
分享  私人訊息  頂部
Works to repair sections of the Demerara Harbour Bridge which were damaged last Sunday morning,NFL Jerseys Wholesale, after a vessel collided with it,Wholesale Jerseys China, have been completed.According to Rawlston Adams, General Manager of the bridge,Andrew Wiggins Jersey, the retractor span which opens up to allow vessels to transit was tested and it is working.Emergency workers racing against time to repair the damaged Demerara Harbour Bridge on Wednesday night.A fuel tanker, Lucy PG, whose local agent is the Guyana National Shipping Corporation (GNSC), was set to pass through heading south to a gas terminal at Providence.However, according to reports, the pilot of the tanker failed to heed warnings and the vessel collided with the bridge.On Monday,Adrian Wilson Cardinals Jersey, Adams announced that the bridge, a critical link between West Demerara and Essequibo and Georgetown,China NFL Jerseys, would be closed Wednesday night starting at 22:00 hrs for six hours to facilitate repairs.The accident left the bridge’s retractor and acceptor spans out of alignment. An emergency crew was assembled and equipment mobilized for emergency repairs to be carried out.According to the General Manager, the bridge was closed to vehicular traffic for approximately four hours on Sunday. In addition to four special connecting posts being broken, there was also severe damage to piles, with a pontoon punctured. Anchorages at a certain section were also shifted.A decision was taken not to retract the bridge for river traffic until the emergency repairs were conducted.On Wednesday evening, inspecting the repairs with Adams was Public Works Minister, Robeson Benn.The aging structure,Cheap NFL Jerseys China, commissioned in 1978, is the main link between the city and West Demerara as well as Essequibo. Government is currently considering proposals for a new bridge across the river.An accident like that which occurred Sunday morning has been among the worst fears for the authorities, because of the structure’s importance to trade and traffic. The bridge has “long outlived its lifespan” but has been kept operational at huge costs because of limited options at this time until a new structure becomes a reality.Kaieteur News was told that there is an active investigation ongoing with talks ongoing with the tanker’s UK owner for compensation.